Mole was awarded the contract for this extensive project, which involved the installation of nearly 1,000 meters of underground drainage. The scope of work included excavations at depths of up to 4.5 meters and the installation of various sizes of pipework across the entire school site. This required precise planning and execution to ensure the drainage system met all necessary specifications and requirements whilst dealing with the school requirements.
Project Duration: 9 months
What We Did:
- Attenuation Systems
- All Drainage works to site including soft and hard reinstatement
- Kingpost Retaining Wall
- Brickwork Alterations and Repairs
- New footpaths around site
- Demolition works
- Step Construction