Leamington Spa Town Hall

In collaboration with a main contractor, we carried out substantial alterations to the existing town hall, which included a rear extension. This project required careful consideration of the building’s historical features, ensuring the new addition complemented the original structure while meeting modern requirements.

Project Duration: 3 months

What We Did:

  • Foundations
  • Lift pit retaining walls
  • Drainage alterations
  • Block and beam flooring
  • Waterproofing system
  • New tarmac area
  • Sewer connection