Leamington Spa Town Hall
In collaboration with a main contractor, we carried out substantial alterations to the existing town hall, which included a rear extension. This project required careful consideration of the building’s historical features, ensuring the new addition complemented the original structure while meeting modern requirements.
Project Duration: 3 months
What We Did:
- Foundations
- Lift pit retaining walls
- Drainage alterations
- Block and beam flooring
- Waterproofing system
- New tarmac area
- Sewer connection